05.2 · Overheads

Creating an Overhead

Quick Workflow

  1. Open the Overheads view.
  2. Click Add Overhead on the toolbar or press Enter on the last row.
  3. Fill:
  4. Item (e.g. "Site Manager").
  5. Qty (e.g. 26) and Unit (e.g. "wk").
  6. Resource (link if you have one; otherwise type a rate).
  7. Rate (per unit).
  8. Save — Total computes as Qty × Rate.

Minimum Required

Just the Item name. Zero-qty / zero-rate overheads work as headers.

Typical Overhead Patterns

ExampleUnitQtyTypical rate
Site Managerwk26$3,500
Project Engineerwk26$2,800
Site Sheds & Servicesmo6$4,500
Scaffold Hiremo6$3,800
Safety Consultanthr120$185
Insurance & Bondslump1$22,000

Status and Visibility

  • Status — same workflow as direct cost items (Draft / Review / Approved / Complete).
  • Omit — excludes from all totals.
  • IsNotContributing — stays visible in the overhead grid but does not join the pool or receive allocations.
  • IsHiddenAndIncluded — hidden from the grid, still apportioned to items (see 05.4).

Categorising

Group overheads using indents (max 6 levels) just like direct costs. Pattern:

Preliminaries
  Site Management
    Project Manager
    Site Engineer
  Facilities
    Sheds
    Amenities
Insurances & Bonds
Design & Approvals

Formatting and Formulas

Identical to direct cost items — formatting per row, formulas in Qty / Rate / Total / custom columns.